Stockton Parkway, Alexandria

Project Timeline: 110 Days

Scope: This project was an in-house Moore Construction Group build. We acquired this waterfront property based on a referral from a local Realtor, and will be placing it back on the market in the beginning of March, 2019. This project included a full gut down to the exterior walls of the existing structure, total reconfiguration, a master suite addition above the garage, and large rear addition with 2nd story terrace.

Work Done:

  • In-house Architectural Design and permitting

  • Gut demolition of interior, fixtures, finishes, framing, and rear solarium

  • Framing of entirely new layout

  • Construction of rear addition and terrace

  • Construction of front addition for master suite

  • All new plumbing, electrical, and HVAC systems

  • 4 new full bathrooms and one powder room

  • Large open concept kitchen

  • Large full service wet bar

  • New roofing and siding throughout

  • New driveway

  • Site excavation and landscaping

  • Permitting, design and construction of 185’ dock

    • Sub panel for yacht 50AMP power

    • High pressure water to front and end of the dock

    • Waterproof LED lighting from end to end